2550m2
W16*L6*H4m*12
2 days
National Exhibition and Convention Center Shanghai
A tailor-made design that claimed impossible by other producers
12 separate halls were erected in 2 days with all the internal finishes done. The structures feature in non-inflatable flat top and fully branding with the surrounding banners and walls to serve as multifunctional halls. To get the best result, the structures were designed with no middle posts. The whole 16x6m structures were supported only by posts on the four corners. We made it and brought it to life while other producers said that was impossible.
Do what others can’t do
When we were assigned to do this job, it was claimed impossible by many of our competitors. Its special design of non-inflatable roof, irregular size and no middle posts set obstacles to others. With close communication with our client and co-work of our design and engineering team, we managed to put it into life.
Non-inflatable flattop design
Different from the traditional inflatable inflation flattop structures, these are without the need to get inflated. While it comes to heavy rains, their roof can always stay taut. These structures have all the advantages the traditional ones have; still the non-inflatable design saves the matter to use inflator and continuous power supply. For a long term purpose, the non-inflation design has its distinct advantage.
Turnkey service within 2 days
We hand over our structures with lighting, A/C, flooring and power supply installed. If required we also provide internal finishes, furniture etc. We hand over our project ready to use. Given a tight schedule, we still managed to finish our work in time. Our team is always prepared to meet challenges. The results come out that we will always ensure the event going on despite all the unfavorable conditions.